The status of the works on site, as at the date of our site inspection on 06 July 2016, can be briefly described as follows; * Basement fit off substantially complete. * Level 1 plaster sheeting complete, glazing installed, joinery installed including bench tops, tiling complete, painting to ceilings complete, walls under coated. * Level […]