The status of the works on site, as at the date of our site inspection on 10 November 2015, can be briefly described as follows:
* Bulk excavation is complete.
* Detailed excavation well underway with footings and columns advanced.
* Lift pit base and lower basement walls to lift complete.
* Form work shutters for Stairwell underway.
* Storm water retention system installed.
* Column steel and concrete bases laid.